Hull renovation

On this Monte Fino 82 MY SECO we realized at the same time a keel repair and an osmosis treatment.

On the other hand we blasted the existing gel coating in order to let the hull dry onshore. We put a new keel lamination, and we puttied the whole hull with epoxy resin. Afterwards we put 9 coats of epoxy-osmosis treatment and finally we put a classical antifouling.

Launch Project

Featured Works